The 188,000 sf Building M consists of class-A laboratory and office space above a ground-level parking garage. Spaces are designed to accommodate large biopharmaceutical and pharmaceutical lab areas, with offices and conference rooms.
A large-scale, technically challenging, and ever-changing project, Lancaster Labs tested the Warfel team to scale for project success. With advanced lab spaces and complex mechanical systems, the building required extensive planning, detailed management, and committed teamwork. An in-house MEP coordinator was instrumental in ensuring that the building’s complex systems were installed correctly.