Haupert Union Building Expansion Overview
The HUB expansion at Moravian University builds on a long-standing center for student life. Originally constructed in 1962, the facility served students for many years, but as the campus grew, the need for updated and expanded spaces became clear. This expansion enhances the student experience through thoughtful improvements and carefully planned additions, with Warfel supporting the effort through careful coordination, maintained access, and continuity throughout construction.
Enhancing Student Life Through the HUB Expansion
The HUB expansion introduces updated spaces that support both academic and social engagement. These include new study areas, gathering spaces, and improved dining facilities for daily campus use. In addition, the project provides a health and wellness center with counseling services for students. Dedicated areas for career engagement and exploration also support student development and future planning.
On the fourth floor, the HUB expansion adds flexible spaces designed for collaboration and events. This level includes a boardroom, conference center, and multiple breakout rooms. Catering support areas help accommodate campus functions and gatherings. An outdoor terrace extends these spaces and offers views overlooking Makuvek Field.
Maintaining Campus Operations During the HUB Expansion
Maintaining access to essential student services remained a priority throughout the HUB expansion. The existing building stayed active while surrounded on three sides by construction. Because of this, careful planning and clear communication guided each phase of the work.
Construction activities were coordinated to reduce disruption while supporting daily campus operations. Students and faculty continued to access dining, meeting areas, and services without major interruption. As a result, the campus experience remained consistent while improvements progressed.
A Thoughtful Approach to Campus Improvement
The HUB expansion reflects a balance between growth and continuity for Moravian University. Each update supports evolving student needs while respecting the building’s role on campus. Through coordination and attention to detail, the project enhances both function and experience.
The result is a renewed campus resource offering flexible, supportive spaces. These updates align with the university’s goals and continue to serve students now and in the future.